Showing posts with label Con rod. Show all posts
Showing posts with label Con rod. Show all posts

Sunday, 7 December 2014

More engine running video

Fire up and running video of engine.


Saturday, 29 November 2014

Fire up!!

Finally the engine is alive! the recent weeks have been really busy at work, leaving not so much time for hobbing and delaying the fire up. But at last the final bits were assembled and after a few mods to the fly wheel the engine run for first time.

The progress from the previous post have only been a new flywheel and the preliminary exhaust manifold. As you can see the engine is fixed in a very crudely manner, which will be changed to make it safer to operate and extra stuff around it (gas tank, etc) properly secured. Obviously the white cable will go away too.



I will make a better and longer video and post it after everything is adjusted. It is mainly tuning the carburettor settings to achieve the full performance that hopefully is in it.





Sunday, 25 May 2014

Con rod machining

The con rod has been machined!! it looks quite good, prior polishing and final work on the bearings. On the sequence below you can see the different machining stages.

The material used on the con rod is 7075 T-6. The bearings are LM-7 Zn bronze, with the top one pressed in and the main one being split. Bolts are M2.

At 14000 RPM the con rod sees a maximum compression load of 820 N and a maximum tension load of 391N. Coefficient of safety is n = 4,4 static and n = 1,1 fatigue (infinite life). I expect fatigue wise it will be safe as 14000 RPM seems quite optimistic for the first test engine for both speed and life time.






After polishing the part will look even better. I will polish it to remove all the tiny notches and sharp edges which will make it look better and improve fatigue resistance.

I will make the split bearings with a tang on each one, and a dowel pin for the real engine. This will improve fitting quality and repeatability of the tolerances.

Next part is the piston, which is one of the most exciting parts of the project.

Tuesday, 20 May 2014

Con Rod manufacturing IT3

Work has begun on the con rod. I will be extending the post as I work along this part and the next parts untill the engine is finished.

I have started with the blank and the machining fixture. All this will come together as what you see below.
More to come :)

The bearings are already finished for it, but will not be mounted until the body and head are machined. After that, the bearings will be reamed to achieve the final bore tolerance for the crankshaft journal and piston pin.