Showing posts with label Engine. Show all posts
Showing posts with label Engine. Show all posts
Sunday, 7 December 2014
More engine running video
Fire up and running video of engine.
Labels:
Carburettor,
Con rod,
Engine,
fire up,
Ignition,
RedBull,
Spark plug,
valve
Saturday, 29 November 2014
Fire up!!
Finally the engine is alive! the recent weeks have been really busy at work, leaving not so much time for hobbing and delaying the fire up. But at last the final bits were assembled and after a few mods to the fly wheel the engine run for first time.
The progress from the previous post have only been a new flywheel and the preliminary exhaust manifold. As you can see the engine is fixed in a very crudely manner, which will be changed to make it safer to operate and extra stuff around it (gas tank, etc) properly secured. Obviously the white cable will go away too.
I will make a better and longer video and post it after everything is adjusted. It is mainly tuning the carburettor settings to achieve the full performance that hopefully is in it.
The progress from the previous post have only been a new flywheel and the preliminary exhaust manifold. As you can see the engine is fixed in a very crudely manner, which will be changed to make it safer to operate and extra stuff around it (gas tank, etc) properly secured. Obviously the white cable will go away too.
I will make a better and longer video and post it after everything is adjusted. It is mainly tuning the carburettor settings to achieve the full performance that hopefully is in it.
Monday, 27 October 2014
Progress
Almost there! just last checking to do and all will be set for the first fire up!


The spark plug was tested with quite nice results as shown, and for sure the spark will be powerful
enough to ignite the fuel-air mixture.
Another development was the assembly of the carburettor inlet onto the engine head. This part is made in RP (Rapid prototyping). In particular, the material of choice is RP SLS Carbon, and was outsourced. The cost was £23 for 1 off.


The spark plug was tested with quite nice results as shown, and for sure the spark will be powerful
enough to ignite the fuel-air mixture.
Another development was the assembly of the carburettor inlet onto the engine head. This part is made in RP (Rapid prototyping). In particular, the material of choice is RP SLS Carbon, and was outsourced. The cost was £23 for 1 off.
Sunday, 21 September 2014
Spark plug
The spark plug is finally finished. The requirement for a custom spark plug is due to the design of the combustion chamber. In order to get the maximum port area the valves use the maximum area available. The off the shelf spark plugs are too big to allow such big valves and so a custom spark plug was required.
The body of the spark plug is made from stainless steel, which is turned, milled and threaded, and finally swaged to capture the insulation components and electrode. The thread is M5, and extra long thread section reduces the chances of wearing out the thread on the engine head. In the V8, I would probably opt to have a wire insert to reduce even further this risk.
The insulation materials are machined from Macor, which is a machinable ceramic. It machines quite nicely, but because of its brittleness one has to be extremely careful. Wall thickness's in some cases is <0,5mm. On the thread section of the spark plug, the diameter of the insulation is Ø2mm and electrode Ø1mm. There are two ceramic parts in this spark plug, with a flange that gets locked by the swaging process. To achieve a leak prof part, adhesive is added during assembly, which seals any void produced by machining tolerances.

A dedicated swaging tool had to be made to press the collar onto the ceramic insulation. There is not much pressure anyway, as the adhesive also helps keeping the bits together and did not want to crack the delicate ceramic material.
Another tool required is the special 4,5 mm spanner socket that is used to fit the spark plug onto the engine head. This is made form a M6 x 120 cap head bolt which cut down in length. The spanner socket for the spark is broached onto the stud section with a custom made broaching tool. The tool is quenched to achieve the required hardness.
All in all, only a few details are left to make: installation of ingnition system (CDI), test bench, carburator assembly.
The engine is looking good so far!
The body of the spark plug is made from stainless steel, which is turned, milled and threaded, and finally swaged to capture the insulation components and electrode. The thread is M5, and extra long thread section reduces the chances of wearing out the thread on the engine head. In the V8, I would probably opt to have a wire insert to reduce even further this risk.
The insulation materials are machined from Macor, which is a machinable ceramic. It machines quite nicely, but because of its brittleness one has to be extremely careful. Wall thickness's in some cases is <0,5mm. On the thread section of the spark plug, the diameter of the insulation is Ø2mm and electrode Ø1mm. There are two ceramic parts in this spark plug, with a flange that gets locked by the swaging process. To achieve a leak prof part, adhesive is added during assembly, which seals any void produced by machining tolerances.

A dedicated swaging tool had to be made to press the collar onto the ceramic insulation. There is not much pressure anyway, as the adhesive also helps keeping the bits together and did not want to crack the delicate ceramic material.
Another tool required is the special 4,5 mm spanner socket that is used to fit the spark plug onto the engine head. This is made form a M6 x 120 cap head bolt which cut down in length. The spanner socket for the spark is broached onto the stud section with a custom made broaching tool. The tool is quenched to achieve the required hardness.
The engine is looking good so far!
Friday, 5 September 2014
Engine head progress 2
Hi there, it´s been a while after last post, but batteries fully charged after the summer break. Hope you all had a good time too.
The engine head has been assembled and is almost completed. All four valves, rockers, cam shafts are working together. All is left is the valve lapping and cups to be ground. I pretend to adjust cam clearance by grinding the cups, so each cup will have to be numbered according to its position and valve.
The valve seats were already cut with an HSS custom made tool. This tool is basically a countersinking tool with a pilot steam to achieve good concentricity with the valve guide. I am sure most of you use the same system.
I hope I can grind the cups and lap the valves this weekend, so I will be posting more pictures soon.
The engine head has been assembled and is almost completed. All four valves, rockers, cam shafts are working together. All is left is the valve lapping and cups to be ground. I pretend to adjust cam clearance by grinding the cups, so each cup will have to be numbered according to its position and valve.
The valve seats were already cut with an HSS custom made tool. This tool is basically a countersinking tool with a pilot steam to achieve good concentricity with the valve guide. I am sure most of you use the same system.
I hope I can grind the cups and lap the valves this weekend, so I will be posting more pictures soon.
Tuesday, 29 July 2014
Engine head progress
This weekend I have made some progress with the engine head. The inlet and exhaust ports have been polished and valve seals have been pressed in. It all went quite nice together. I used some Dremel tools and polishing compound to polish the ports in the inside, with extreme care to not damage the mating surfaces for the inlet and exhaust and valve seats. On the pictures you can see the dedicated fixtures to press the valve seats and guides into the head.
The upper assembly with the camshaft carriers and little brackets has also been put together. As the top of the engine will be open, it will be possible to see any leaks or other issues inside the head. The brackets are only for the test engine as the V8 holds the cam shafts with the head covers.
The valves were almost finished, I just had to grind the top and bottom surfaces to final dimension. So they are ready to install. The material for valves is SS AISI 316.
During the week I expect to finish the bores for the cam shafts, including the bronze split bearings installation. Also the countersunk on the valve seats.
The upper assembly with the camshaft carriers and little brackets has also been put together. As the top of the engine will be open, it will be possible to see any leaks or other issues inside the head. The brackets are only for the test engine as the V8 holds the cam shafts with the head covers.
The valves were almost finished, I just had to grind the top and bottom surfaces to final dimension. So they are ready to install. The material for valves is SS AISI 316.
During the week I expect to finish the bores for the cam shafts, including the bronze split bearings installation. Also the countersunk on the valve seats.
Monday, 21 July 2014
Lower engine assembly
I have virtually completed the lower assembly of the engine. The crankshaft is finished and finally assembled with con rod inside the crankcase.
You can see that the crankshaft has 6 holes on the counterweight area. These will be filled with tungsten bars. This is to adjust the amount of weight on the counterweight as well as keeping the inertia low. On the V8 one I might not do it as it is a lot of hassle as the tungsten is really hard to work with. I have to use a right angle grinder and because the pieces are so tiny it is quite a dangerous job.
The bolts to on the con rod are M2. I will replace the current stainless steel by 12.9 steel ones.
The cylinder liner is from a Lapped internal H7 steel off the self tube, that I turned to fit the aluminium engine block. It is not hardened but I hope it will be just fine for this test engine.
I am going to use gasket sealant, like Loctite 5800 as I do not plan to use any joints on between the crankcase and engine block.
You can see that the crankshaft has 6 holes on the counterweight area. These will be filled with tungsten bars. This is to adjust the amount of weight on the counterweight as well as keeping the inertia low. On the V8 one I might not do it as it is a lot of hassle as the tungsten is really hard to work with. I have to use a right angle grinder and because the pieces are so tiny it is quite a dangerous job.
The bolts to on the con rod are M2. I will replace the current stainless steel by 12.9 steel ones.
The cylinder liner is from a Lapped internal H7 steel off the self tube, that I turned to fit the aluminium engine block. It is not hardened but I hope it will be just fine for this test engine.
I am going to use gasket sealant, like Loctite 5800 as I do not plan to use any joints on between the crankcase and engine block.
Sunday, 25 May 2014
Con rod machining
The con rod has been machined!! it looks quite good, prior polishing and final work on the bearings. On the sequence below you can see the different machining stages.
The material used on the con rod is 7075 T-6. The bearings are LM-7 Zn bronze, with the top one pressed in and the main one being split. Bolts are M2.
At 14000 RPM the con rod sees a maximum compression load of 820 N and a maximum tension load of 391N. Coefficient of safety is n = 4,4 static and n = 1,1 fatigue (infinite life). I expect fatigue wise it will be safe as 14000 RPM seems quite optimistic for the first test engine for both speed and life time.
After polishing the part will look even better. I will polish it to remove all the tiny notches and sharp edges which will make it look better and improve fatigue resistance.
I will make the split bearings with a tang on each one, and a dowel pin for the real engine. This will improve fitting quality and repeatability of the tolerances.
Next part is the piston, which is one of the most exciting parts of the project.
The material used on the con rod is 7075 T-6. The bearings are LM-7 Zn bronze, with the top one pressed in and the main one being split. Bolts are M2.
At 14000 RPM the con rod sees a maximum compression load of 820 N and a maximum tension load of 391N. Coefficient of safety is n = 4,4 static and n = 1,1 fatigue (infinite life). I expect fatigue wise it will be safe as 14000 RPM seems quite optimistic for the first test engine for both speed and life time.
After polishing the part will look even better. I will polish it to remove all the tiny notches and sharp edges which will make it look better and improve fatigue resistance.
I will make the split bearings with a tang on each one, and a dowel pin for the real engine. This will improve fitting quality and repeatability of the tolerances.
Next part is the piston, which is one of the most exciting parts of the project.
Friday, 7 February 2014
More progress with IT3 engine
After a few months without doing much work, I have been putting in some hours in the last weeks at the workshop. It is nice to start seeing the parts in real live that I have been designing for some time, although it has been quite painfull in some instances. Camshafts, cranshaft and valves are all quite triky to machine for its geometry, tolerances and material of choice.
Cam shafts. there are two camshafts, that operate the inlet and outlet valves separatelly. They are slighly different, as the pitch between the IN valves is different to the pitch ont he EX valves. This arrangement allows the maximum valve surface with a given cylinder diameter. The material for the cam shafts is EN24T and is quite hard to machine. At the stage shown, the cams have not been milled yet. For the IT3 engine I will mill the valves, with interpolation as the tests I have made are quite good. See the next picture below. The cam profile was calculated in Excel, then transferred in Catia using a macro, and then into Visual mill. The profile is different from EX valves to IN valves. I will post more pictures after the cams have been milled. The millign of the front flange is also missing, and it will accomodate the features to connect the timming gears. Both cam shafts, have a Ø8 mm diameter on the main shaft, and are bored to Ø6 mm, making it quite light. I will try to keep this arrangement on the V8 engine, although it will be a challenge to drill such a lenght in this steel.
The next op consists of milling the material around the rod journal, rather than turning it. I just did it like that because it is much safer. See as well, that the cranshaft now is fixed on the secondary axis, ready to turn the rod journal. The next picture shows the rod journal being finished.
I have been doing external parts of the engine first, then internals that require turning and will finish with internals that are mainly milled. It is intersting to see the nice learinign curve from the IT1 to the IT3 at all levels: resources, cost, materials, design techniques.
Every component requires a lot more time to manufacture, and uses the equipment´s capabilities more extensibely. One noticeable example is the engine head. On IT1 it was made with 3 axis machining, with two main ops. On IT3 it has to be done with 4 axis machining, and it takes 13 ops, aproximatelly 10 times as much machining time, and 6 times as much cost in cutting tools. This is true for most of the parts and will have a big impact on final cost of the V8 engine and time required to manufacture.
On the design side of things, although it is more complex, it is more enjoyable. The better I learn how to use my equipment, the freer design becomes. On the other side, there is still a limit of resource and times available, although this will be enhanced with the use of DMLS and rapid casting techniques I am planning to use for most of the engine external and structural parts. I am considering outsourcing some components of the internals as cost would not be that high compared with the amount of time and tooling costs it would take me.
See some components that I have made so far, although not fully finished:
I have made now the 4 valves that will be used on the IT3 (2 exhaust valves and 2 inlet valves). The one on the picture below is a inlet valve. The stem has Ø3mm on its sliding surface, and Ø2 mm on the wet section. The valve head is Ø14 mm. On the image, the valve still has some material to be removed at the top. I will do that on a secondary op, as the top needs to be grinded to achive a high level of flatness and height tolerance. Material is stainless steel AISI316L for both types, and was not too hard to machine.
Below is the sequence of pictures of the crankshaft machining. It is also made in EN24T, and is quite hard to machine. The nice thing is that it is turned using this arrangement, rather than with the chuck. This is to allow the turning of two differnet axis of the main and rod journal. I started with a billed of Ø30 mm in diameter. See the bracket on the left to spin the part that I made.
Below is the first op finished. This is basically the turning of the main journal, which consists of different diameters, that will be used to fit the timing sproket and the fly wheel. On this engine I have not added any feature to spin the engine. I will rather use a friction wheel on against the fly wheel as it is quite a big one (for what I am used to). The main journal is Ø10mm and the rod journal is Ø12 mm.
The next op consists of milling the material around the rod journal, rather than turning it. I just did it like that because it is much safer. See as well, that the cranshaft now is fixed on the secondary axis, ready to turn the rod journal. The next picture shows the rod journal being finished.
The next steps are to mill the camshaft to form the counterweight area, and key groves for the timming sproket and flywheel. There will not be any oil passages on this one, to simplify the component, it will use a splash type of crank case.
Below is a picture of my workshop being busy on a late dinner time. Many more to come.
Thursday, 19 December 2013
Test engine IT3
After a while of not wrinting any post I finally found a minute to show some pictures of the engine I am working on. This is a single cylinder test engine, which will be used to test the design of the V8 cylinders. The design is almost 100% complete but I have already made some of the main parts.
I will be posting more often from now on. The next two pictures are from the engine head - quite a lot of machining!
This is one of the split bearings. It is quite hard to machine due to the tang for locking the position in rotation. It is all made on the milling machine, using a rotary table.It is accurate to 0.01 mm in all dimensions, which is quite an achievement bearing in mind my equipment.
You can see I also do drawings for every single part to keep all the details for when I start designing the V8 engine in a few months.
I will be posting more often from now on. The next two pictures are from the engine head - quite a lot of machining!
These is the engine head rockers bracket. There are two per cylinder. It is quite an original design but I do not think they will make it to the final V8 engine design.
This is the main engine parts put together. The cam cover is missing.
This is one of the split bearings. It is quite hard to machine due to the tang for locking the position in rotation. It is all made on the milling machine, using a rotary table.It is accurate to 0.01 mm in all dimensions, which is quite an achievement bearing in mind my equipment.
You can see I also do drawings for every single part to keep all the details for when I start designing the V8 engine in a few months.
Subscribe to: